Electricity structure
Electricity Structure of Power Sector | Installed generation capacity: | 8,355 MW | | of which | Thermal: | 62 % | | | Nuclear: | 0 % | | | Hydro: | 34 % | | | Fuel oil-fired, gas-fired and CHP plants | 4 % | Structure of Electric Energy Generation and Transmission | The EPS Thermal Power Plants | 26,546 GWh | | The EPS Hydro Power Plants | 11,924 GWh | | Withdrawn from the neighbouring systems | 7,.926 GWh | | Injected into the neighbouring systems | 8,474 GWh | | Transmission losses on all voltage levels (400 / 110 kV) | 1,423GWh | Substations and Hi-Voltage Trunks in Serbian electricity grid | Substations (total: 87) | Hi-voltage Trunks | | Voltage level | Installed capacity | Line length | Voltage level | | 400 kV | 7 150 MVA | 1 538 km | 400 kV | | 220 kV | 7 050 MVA | 2 151 km | 220 kV | | 110 kV | 13 150 MVA | 5 720 km | 110 kV |  |
|
|
|
|
|